Choptank – Sharp Barn Track House

Owner: Choptank, L.L.C.- Sharp Barn Track House

Project Location: Middletown, DE

Size: 2,800 S.F.

Completed: October 2012

Materials: Acrymax Technologies, Inc.

Description: Prepare the existing roof surface by power washing dirt and loose paint. Apply primer sealer over any exposed rusted metal. Seal any holes or cracks in metal with polyurethane sealant. Install one coat of aluminum grey elastomeric base coat over entire roof. Installed Acrymax White Elastomeric coating to every panel, followed with Acrymax Williamsburg Blue Elastomeric coating on every other panel creating a stripped pattern.