UD – Hullihen Hall

UD - Hullihen Hall

Owner:  University of Delaware – Hullihen Hall

Project Location:  Newark, DE

Size:  8,900 S.F.

Completed:  July 2011

Materials:  Carlisle SynTec, Inc.

Description:   Removed the existing EPDM membrane and built-up roofing systems by way of an elaborate scaffolding and chute system which spanned over perimeter sloped roof areas. Installed new high R-value insulation and gypsum cover board secured to varying roof deck types to meet Factory Mutual wind uplift requirements. Applied a new fully adhered EPDM membrane roof system with a 20 year warranty. Installed pre-manufactured aluminum coping and custom copper sloped perimeter walls. All work was performed in a limited access area and over the executive offices of the University. Slate tie-ins and repairs were included with the work.